Capital Metals today updates the market on the economics for the development of the Eastern Minerals Project in Sri Lanka – one of the world's highest grade mineral sands projects. The low capital cost of $37m to positive cashflow and $81m in total (which includes a 20% contingency) is to be spread over 4 years as Capital Metals brings the project into full production in four stages; from delivering a Heavy Mineral Concentrate (HMC) to expansion and mineral separation to sell separate mineral s ....

12 May 2022
WH Ireland: Capital Metals (CMET) - Updated development study for Eastern Minerals Project, Sri Lanka


Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
WH Ireland: Capital Metals (CMET) - Updated development study for Eastern Minerals Project, Sri Lanka
Capital Metals plc (CMET:LON) | 6.0 0 -4.2% | Mkt Cap: 11.3m
- Published:
12 May 2022 -
Author:
Paul Smith | David Seers -
Pages:
5 -
Capital Metals today updates the market on the economics for the development of the Eastern Minerals Project in Sri Lanka – one of the world's highest grade mineral sands projects. The low capital cost of $37m to positive cashflow and $81m in total (which includes a 20% contingency) is to be spread over 4 years as Capital Metals brings the project into full production in four stages; from delivering a Heavy Mineral Concentrate (HMC) to expansion and mineral separation to sell separate mineral s ....